Problems:

In our first filming session, we had some problems. This was poor lighting and a lack of continuity in our footage. We originally decided to film at 3:30 pm , however, when we watched back our footage, we saw that the natural lighting was extremely poor therefore affecting the quality of our opening sequence as well as us rushing. Also, we had recorded shots which didn't fit together, and we didn't have a wide enough range of camera angles or movements as they were repeated. We reviewed this in class, and decided it would be best if we recorded again, and made our footage a lot more fast paced- a convention of the Spy genre- and better flowing. We then planned to record the following weekend after discussion of improvement, and spent twice as long as we did to record our original sequence. Our results were a lot better, and we recorded earlier in the day to ensure that the natural lighting was correct, and the footage to a good quality. We followed the same storyboard, and used the same location as we had initially planned. This resulting in a better video making it look the part.




No comments:

Post a Comment